fbpx
Home 4 Gang Meter Base Replacement 2019 IMG_1908-480x640-NewBoard-Copyright

IMG_1908-480×640-NewBoard-Copyright

View of the new meter base on saw horses getting prepped for the installation. A two inch hole was made in the bottom with a knockout punch to accommodate the existing 2" PVC conduit coming out of the ground. Reducing washers are used to protect the concentric knockouts

A new primed and painted backboard to support a new meter base

The old rusty 4 gang electric meter base is removed and a moldy rotting backboard is exposed
The remains of the old meter base ready for recycling