New Meter Stack

View of the new meter base on saw horses getting prepped for the installation. A two inch hole was made in the bottom with a knockout punch to accommodate the existing 2" PVC conduit coming out of the ground. Reducing washers are used to protect the concentric knockouts

The installed 5 gang meter base to replace the old rusty 4 gang base.

The remains of the old meter base ready for recycling
The old ground rod with the utility connections on it